Skip to content

docs: reconcile Builder foundation status - #15

Merged
krisoshea-eth merged 1 commit into
mainfrom
krisoshea/reconcile-9781-and-api-02-status
Aug 14, 2026
Merged

krisoshea-eth merged 1 commit into
mainfrom
krisoshea/reconcile-9781-and-api-02-status

Conversation

@krisoshea-eth

@krisoshea-eth krisoshea-eth commented Aug 14, 2026 •

Copy link
Copy Markdown
Owner

Summary

  • update the current Lodestar baseline to v1.46.0 and record #9781 as merged with Nico approval and passing checks
  • record API-02's post-#9781 integration, 25 focused observer tests, and 45 passing Builder package tests
  • narrow REVIEW-01 to the twelve remaining review-thread markers, #9819, and #9827 without rewriting the dated August 10 snapshot
  • append an August 14 Week 9 checkpoint and refresh current implementation-plan and Living Technical Note status sections

Tracking reconciled

  • Linear LOD-47 and GitHub issue #47 now describe the merged implementation and remaining post-merge work
  • API-02 and SPEC-01 GitHub Project status fields now match Linear as In Review
  • LOD-12's #9781 evidence link now points to the merged upstream PR

Verification

AI assistance

AI assistance was used during repository research, drafting, and review. The submitted changes were manually reviewed and revised by the author.

Summary by CodeRabbit

  • Documentation
    • Updated project plans and technical notes with the 14 August 2026 execution baseline and Lodestar v1.46.0 status.
    • Documented completed Builder lifecycle behavior, API integration evidence, and updated testing, metrics, review, and follow-up work.
    • Added a work-log checkpoint covering merged changes, test results, documentation progress, and remaining review requirements.

@coderabbitai

coderabbitai Bot commented Aug 14, 2026 •

Copy link
Copy Markdown

Review Change Stack

Caution

Review failed

The pull request is closed.

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro Plus

Run ID: d8e4d200-a878-4f80-930b-1af984d3fefb

📥 Commits

Reviewing files that changed from the base of the PR and between 3d8ec24 and 00ae751.

📒 Files selected for processing (3)
  • docs/implementation-plan.md
  • docs/living-technical-note.md
  • docs/work-log.md

📝 Walkthrough

Walkthrough

This documentation update establishes the 14 August 2026 baseline with Lodestar v1.46.0, merged Builder work, API-02 evidence, updated lifecycle notes, and separated follow-up ownership for review, testing, metrics, and environment work.

Changes

Baseline and follow-up documentation

Layer / File(s) Summary
Stable baseline refresh
docs/implementation-plan.md, docs/living-technical-note.md
The documents now use stable Lodestar v1.46.0 and record the 14 August reconciliation baseline.
Builder lifecycle and API evidence
docs/implementation-plan.md, docs/living-technical-note.md
The documentation records merged Builder lifecycle behavior, API-02 test evidence, and updated implementation references.
Follow-up ownership and checkpoint log
docs/implementation-plan.md, docs/living-technical-note.md, docs/work-log.md
The roadmap and trackers assign post-merge review, testing, metrics, environment, and API follow-up work. The work log adds the 14 August checkpoint.

Estimated code review effort: 2 (Simple) | ~10 minutes

Possibly related PRs

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch krisoshea/reconcile-9781-and-api-02-status

Comment @coderabbitai help to get the list of available commands.

@krisoshea-eth
krisoshea-eth marked this pull request as ready for review August 14, 2026 16:11
@krisoshea-eth
krisoshea-eth merged commit 0141634 into main Aug 14, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant